I
|
Area
of land allotted (in acres)
Whether
land transferred in the Name of Samiti
Vidyalaya
shifted to permanent buildings on
|
:
23.11 Acre
:
Yes
:
1986
|
|
ii
|
Status
of Boundary Wall
A.
Brick Wall
B.
Barbed wire fencing
|
(Completed
)
NA
|
|
iii
|
Permanent
buildings constructed
|
(CBRI
pattern)
|
|
iv
|
School
building
|
:
Complete
|
|
v
|
Dormitories
|
:
Boys 1.5 Nos.
Girls 0.75 No.
|
|
vi
|
Kitchen/dining
Hall
No.
of shifts required for all students to take food
|
Complete
One
Shift
|
|
vii
|
Principal
Residence
|
01
No.
|
|
viii
|
Staff
Quarters
|
Type
III = 16 Blocks (08Nos.)
Type II
= 12 Block (04 Nos.)
SP
Sheet = 10 No.
|
|
ix
|
M.P.
Hall
|
Available
|
|
x
|
Workshop
|
Available
|
|
xi
|
Type
of O.H. Tank
Its
capacity
Present
Status
|
Shaft
type / Column based
100000 litres
Not
Working
|
|
xiii
|
D.G.
Set
|
Available
Kirloskar
make 10 KV in Working
Year
of procurement 1992-1993
|
|
xiv
|
Sewage
Pump
|
N.A.
|
|
xv
|
Water
Pump
|
01 Nos
7.5 H.P.- Capacity
04 nos
3.0 HP
|
|
xvi
|
Electrification
Electric
connection
Sub
Station building
Street
lighting
Numbers
of hrs. During day when power supply is available on
an average.
|
Urban
Feeder
N.A
Yes 55
Poles
18
hrs.
|
|
xvii
|
Playfields
400
metre track
40 x
30 metre basket ball court
40 x
30 metre volley ball court
|
Not
available
02 Nos.
Available
02 Nos
Available
|
|
xviii
|
Water
supply
Tube
Well
Hand
pump
Connection
from PHED
|
Potable,
02 Nos.
Potable,
07
Nil
|
|
xix
|
Rajiv
Gandhi Smriti Van
|
Available
|
|
xx
|
Fire
fighting arrangement
|
Working
|
|
xxi
|
Last
date of cleaning of
(a)
Septic tank
(b)
Water tanks
|
20.04.2009
30.04.2009
|
|
xxiv
|
Works
taken up under M&R fund during current year and
last year:-
|
|
|
Year
|
Name
of work (M&R)
|
Expenditure
(Rs.
In lacs)
|
Cumulative
expenditure during the year
|
|
2008-09
|
All
work
|
4.15
Lac
|
|
|
2009-10
|
All
work
|
3.00
Lac
|
|
|